ON THE JOB
Before the Water Goes In
The most important pool electrical work happens before anyone sees it. Here's what we're doing while the pool is still a concrete shell.
STEP 1
Lights planned and placed
We lay out every pool and spa light niche with the builder before the shell is finished, so the lighting lands exactly where the design calls for it.
STEP 2
Wiring and bonding at the shell stage
Bonding, light conduit and equipment circuits go in while the deck is being built. Done right now, it never has to be torn up later.
STEP 3
Powered up and inspected
Deck bollards, landscape lights and pool equipment are energized, tested and passed inspection before the first swim.